深夜福利网址-深夜福利影院在线观看-深夜福利在线看-深夜精品视频-深夜日韩-深夜视频福利

Welcome to Dongguan Haochen Hot Runner Technology Co., Ltd!
中文    EN

Haochen 20 years of focus on multimode cavities and small spacing hot runner

Service /


Mobile: 13712972461
Tel: 0769-85478528
400-0988-117
Fax: 0769-85478508
Email: sales@hostar888.com
Website: www.beijingcp.com.cn
Address: No. 11 Zhenlang Road, Wusha Caiwu Industrial Second Road, Chang'an Town, Dongguan City
Industry NewsYour location: Home > News > Industry News

How to complete the hot runner mold trial in 8 steps

Publisher: Administrator Date: 2023-11-02

Hot runner mold trial 8 steps

Step 1. Set the temperature of the bucket

It should be noted that the initial barrel temperature setting must be based on the recommendation of the material supplier. This is because different manufacturers and brands of the same material may have significant differences, and material suppliers often have their own

Considerable in-depth research and understanding. Users can make basic settings based on their recommendations, and then make appropriate adjustments according to the specific production situation.

In addition, a detector is also required to measure the actual temperature of the melt. Because the barrel temperature we set often cannot guarantee 100% consistency with the melt temperature due to differences in environment, temperature sensor model, and location depth.

Sometimes, due to the presence of oil stains or other reasons, the actual temperature of the melt and the set temperature of the material barrel differ greatly (previously, we had examples where the temperature difference between the two was as high as 30 ℃).

Step 2. Set the temperature of the mold

Similarly, the initial mold temperature setting must also be based on the recommended values provided by the material supplier.

It should be noted that the mold temperature we refer to refers to the surface temperature of the mold cavity, rather than the temperature displayed on the mold temperature controller. Many times, due to environmental factors and improper power selection of the mold temperature controller, the display on the mold temperature controller

The temperature is not consistent with the surface temperature of the mold cavity. Therefore, before the formal trial mold, the temperature of the mold cavity surface must be measured and recorded. At the same time, measurements should also be taken at different positions in the mold cavity to check if the temperature at each point is balanced,

And record the corresponding results to provide reference data for subsequent mold optimization.

Step 3

Based on experience, preliminarily set parameters such as plasticizing amount, injection pressure limit, injection speed, cooling time, and screw speed, and optimize them appropriately.

Step 4. Conduct a filling test to identify the transition points.

The transition point refers to the transition point from the injection stage to the pressure maintaining stage, which can include screw position, filling time, and filling pressure. This is one of the most important and fundamental parameters in the injection molding process. In actual filling tests, the following points need to be followed:

(1) The holding pressure and holding time during the test are usually set to zero;

(2) The product is generally filled to 90%~98%, depending on the wall thickness and the structural design of the mold;

(3) Due to the impact of injection speed on the position of the transfer point, it is necessary to reconfirm the transfer point every time the injection speed is changed.

Through filling experiments, users can see the flow path of the material in the mold cavity, thereby determining where the mold is prone to air trapping or where exhaust needs to be improved.

Step 5. Find the limit value of injection pressure.

During this process, attention should be paid to the relationship between injection pressure and injection speed. For hydraulic systems, pressure and speed are interrelated. Therefore, it is not possible to set both parameters simultaneously to meet the required conditions.

The injection pressure set on the screen is the limit value of the actual injection pressure, therefore, the limit value of the injection pressure should be set to always be greater than the actual injection pressure. If the injection pressure limit is too low, causing the actual injection pressure to approach or exceed the injection pressure

By limiting the value, the actual injection speed will automatically decrease due to power limitations, thereby affecting the injection time and molding cycle.

Step 6. Find the optimized injection speed.

The injection speed referred to here refers to an injection speed that simultaneously minimizes the filling time and minimizes the filling pressure. During this process, the following points need to be noted:

(1) Most surface defects of products, especially those near the gate, are caused by injection speed.

(2) Multi stage injection is only used when one injection cannot meet the process requirements, especially during the mold trial stage.

(3) When the mold is intact, the pressure transfer point is set correctly, and the injection speed is sufficient, the speed of injection is not directly related to the generation of flash.

Step 7. Optimize the holding time.

The holding time is also the condensation time of the gate. Generally, the condensation time of the gate can be determined by weighing to obtain different holding times, and the optimal holding time is the time when the product mold weight reaches its maximum.

Step 8. Optimize other parameters, such as holding pressure and locking force.

Finally, it should be emphasized that the purpose and focus of the trial mold is to optimize the mold and process to meet the requirements of mass production, rather than just testing out good product samples.



Dongguan Haochen Hot Runner Technology Co., Ltd
Contact Us:
Mobile: 13712972461
Tel: 0769 85478528/400 0988 117
Fax: 0769-85478508
Email: sales@hostar888.com
Website: www.beijingcp.com.cn
Address: No. 11 Zhenlang Road, Wusha Caiwu Industrial Second Road, Chang'an Town, Dongguan City

粵ICP備18086307號
CopyRight ? 2023 Dongguan Haochen Hot Runner Technology Co., Ltd. All Right Reserved.

Online
Service

ConsultationTime:9:00-18:00

Select customer service:

Hot
Line

400-0988-117
7*24H Service

Follow
Us

Website
TOP
主站蜘蛛池模板: 欧美午夜性生活 | 97电影网站| 国产精品久久久久国产精品日日 | 超碰人人舔 | 三日本三级少妇三级99 | 国产香蕉久久精品综合网 | 午夜男人影院 | 国产精品99久久久久久人免费 | 99久热在线精品视频成人一区 | 久久视频免费在线观看 | 在线激情av电影 | 激情婷婷久久 | 日日夜夜精品视频天天综合网 | 久久亚洲精品国产亚洲老地址 | 成人app在线免费观看 | 日韩资源视频 | 五月天婷婷综合 | 午夜黄色一级片 | 成人综合婷婷国产精品久久免费 | 999成人网| 四虎国产精品成人免费4hu | av色综合| av黄色免费在线观看 | 黄色小说免费观看 | 精品日本视频 | 精品福利视频在线 | 麻豆成人精品 | 在线观看一区二区精品 | 99久国产 | 日韩久久精品一区 | 97国产大学生情侣白嫩酒店 | 日日日视频 | 欧美日韩国产二区三区 | 亚洲国产丝袜在线观看 | 久久久久久久久久久福利 | 欧美色图亚洲图片 | 手机av电影在线观看 | 亚洲理论视频 | 天天爽夜夜爽人人爽曰av | 日韩理论电影在线观看 | 久久图 | 天天干天天干天天干天天干天天干天天干 | 久久国产成人午夜av影院潦草 | 国产一区在线看 | 在线观看国产日韩 | av资源在线看 | 99久久99久久免费精品蜜臀 | 亚洲国产影院 | 又紧又大又爽精品一区二区 | 精品国产资源 | 日韩黄在线观看 | 天天夜夜操 | 色婷婷国产精品一区在线观看 | 国产无吗一区二区三区在线欢 | 久久久久久毛片精品免费不卡 | 欧美精品在线一区二区 | 中文字幕色在线视频 | 国产一区二区视频在线 | 久久久久欠精品国产毛片国产毛生 | 久久99九九99精品 | 国产精品99久久免费观看 | 在线观看午夜av | 国产又粗又猛又黄又爽 | 久久精品久久久久 | 91在线资源 | 色激情在线| 欧美性色黄 | 五月综合激情婷婷 | 中文字幕一区二区在线播放 | 在线99视频 | 日日天天av | 一级α片免费看 | 国产视频亚洲视频 | 欧美日韩不卡一区二区三区 | 日韩欧美在线视频一区二区 | 蜜臀久久99精品久久久无需会员 | 色综合久久网 | 五月开心激情 | 韩日精品在线 | 草在线| 午夜精品久久久久久久99水蜜桃 | 久久久久久久久久久综合 | 国产高清视频免费观看 | 久久国产a | av一区二区在线观看中文字幕 | 国产精品麻 | 日韩综合一区二区三区 | 美女视频黄频大全免费 | 黄色1级毛片| 极品美女被弄高潮视频网站 | 国产精品一区二区精品视频免费看 | 中文字幕在线观看第二页 | 久久香蕉电影 | 久久九九视频 | 亚洲人成人在线 | 日本久久综合网 | 五月天视频网站 | 国产永久免费观看 | 国产精品18久久久久vr手机版特色 |