深夜福利网址-深夜福利影院在线观看-深夜福利在线看-深夜精品视频-深夜日韩-深夜视频福利

Welcome to Dongguan Haochen Hot Runner Technology Co., Ltd!
中文    EN

Haochen 20 years of focus on multimode cavities and small spacing hot runner

Service /


Mobile: 13712972461
Tel: 0769-85478528
400-0988-117
Fax: 0769-85478508
Email: sales@hostar888.com
Website: www.beijingcp.com.cn
Address: No. 11 Zhenlang Road, Wusha Caiwu Industrial Second Road, Chang'an Town, Dongguan City
Industry NewsYour location: Home > News > Industry News

Analysis of Common Faults in Hot Runner Maintenance System

Publisher: Administrator Date: 2023-11-02

Compared with ordinary runner molds, hot runner molds have obvious advantages such as time-saving and material saving, high efficiency, and stable quality. However, at one time, their widespread application was affected by the tendency to produce defects in application. With the improvement of skills in the mold industry, hot runner molding has made significant improvements in controlling the melt temperature of the runner, ensuring structural stability, and designing and manufacturing hot runner components. This has led to the re recognition and favor of hot runner technology.


1、 The residue at the gate is protruding or salivating, and the material and appearance are poor


1. Main reasons


The selection of the gate structure is unreasonable, the temperature control is improper, and there is a large residual pressure in the melt in the flow channel after injection.


2. Handling Measures


1) Improvement of gate structure. Usually, if the length of the gate is too long, it will leave a longer gate material handle on the surface of the plastic part, and if the gate diameter is too large, it can easily lead to salivation and material dripping. When the above problems occur, it is important to consider changing the gate structure. The common gate methods for hot runner include straight gate, point gate, and valve gate.


2) Reasonable temperature control. If the cooling water in the gate area is not sufficient, it will cause heat to gather and form salivation, material dripping, and wire drawing phenomena. Therefore, when the above phenomena occur, the cooling in the area should be strengthened.


3) Resin pressure relief. Excessive residual pressure in the flow channel is one of the main reasons for salivation. In general, injection machines should adopt buffering circuits or buffering devices to prevent salivation.


2、 Material discoloration, charring, or degradation


1. Main reasons


Improper temperature control; The small size of the runner or gate causes significant shear heat generation; The dead center in the flow channel leads to a prolonged heating time of the resident material.


2. Handling Measures


1) Accurate temperature control. In order to accurately and quickly measure temperature fluctuations, it is necessary to ensure that the thermocouple temperature measuring head firmly contacts the flow channel plate or nozzle wall, and is located at the center of each independent temperature control zone. The distance between the head temperature sensing point and the flow channel wall should not be greater than 10mm, and the heating element should be evenly distributed on both sides of the flow channel as much as possible.


(2) Correct the size of the gate. Efforts should be made to prevent dead spots in the flow channel, increase the gate diameter appropriately within the allowable range, and prevent excessive shear heat generation. The melt of the internally heated nozzle has a large temperature difference in the radial direction of the flow channel, which is more prone to coking and degradation. Therefore, it is important to note that the radial size design of the flow channel should not be too large.


3、 Short injection quantity or no material injection


1. Main reasons


Obstacles or dead corners present in the flow channel; Gate blockage; A thick condensation layer appears in the flow channel.


2. Handling Measures


1) During the design and processing of the flow channel, it is necessary to ensure that the melt flows to the curved wall surface for arc transition, so that the entire flow channel is smooth without any active dead corners.


2) Properly increase the material temperature without affecting the quality of the plastic parts, to prevent premature solidification of the gate.


3) Properly adding hot runner temperature to reduce the thickness of the condensation layer of the internally heated nozzle, reduce pressure loss, and then facilitate the filling of the cavity.


4、 Serious material leakage


1. Main reasons


Damaged sealing elements; The heating element is burnt out, causing uneven expansion of the flow channel plate; The center of the nozzle and the gate sleeve is misaligned, perhaps the projection area of the melt insulation layer determined by the sealing ring on the nozzle is too large, causing the nozzle to retreat.


2. Handling Measures


1) Check the sealing elements and heating elements for damage. If there is any damage, carefully check before replacement whether it is a component quality issue, structural issue, or a result of normal service life.


2) Choose appropriate leak stopping methods. According to the insulation method of the nozzle, two structures can be used to prevent leakage: a sealing ring or nozzle contact. Attention should be paid to maintaining a secure contact condition at the leak stop contact area.


5、 The hot runner cannot heat up normally or the heating time is too long


1. Main reasons


The distance between the wire channels is not sufficient, resulting in wire breakage; When installing the mold, the wires intersect and cause short circuits, leakage, and other phenomena.


2. Handling Measures


Select the correct processing and installation process to ensure that all wires can be placed, and use high-temperature insulation materials according to rules to regularly detect wire damage.


6、 Poor material or color change


1. Main reasons


Improper method of changing materials or colors; The unreasonable design or processing of the flow channel results in a large amount of residual material inside.


2. Handling Measures


1) Improve the structural design and processing methods of the flow channel. When designing the flow channel, efforts should be made to prevent dead spots in the channel, and circular arc transitions should be made at each corner as much as possible. Within the allowed range, the size of the flow channel should be as small as possible, so that there is less residual material in the channel and the flow rate of new material is high, which is conducive to rapid cleaning and cleanliness. When processing the flow channel, regardless of its length, it is necessary to process from one end. If the two ends are processed together, it is easy to form a non overlapping center of the hole, which inevitably leads to the formation of a stuck material area. Generally, the external heating nozzle can easily clean the flow channel because the heating device does not affect the melt activity, while the internal heating nozzle is prone to forming a condensation layer on the outer wall of the flow channel, which is not conducive to rapid material replacement.


2) Choose the correct refueling method. The process of material replacement and color change in the hot runner system generally involves pushing all the remaining materials directly out of the runner, and then moving the remaining materials on the runner wall forward, making cleaning easier. On the contrary, if the viscosity of the new material is low, it is easy to enter the center of the retained material and separate the retained material layer by layer, making cleaning more difficult. If the viscosity of the new and old materials is similar, rapid material replacement can be achieved by accelerating the injection speed of the new material. If the viscosity of the retained material is sensitive to temperature, it can be appropriately increased to reduce the viscosity and accelerate the refueling process.



Dongguan Haochen Hot Runner Technology Co., Ltd
Contact Us:
Mobile: 13712972461
Tel: 0769 85478528/400 0988 117
Fax: 0769-85478508
Email: sales@hostar888.com
Website: www.beijingcp.com.cn
Address: No. 11 Zhenlang Road, Wusha Caiwu Industrial Second Road, Chang'an Town, Dongguan City

粵ICP備18086307號
CopyRight ? 2023 Dongguan Haochen Hot Runner Technology Co., Ltd. All Right Reserved.

Online
Service

ConsultationTime:9:00-18:00

Select customer service:

Hot
Line

400-0988-117
7*24H Service

Follow
Us

Website
TOP
主站蜘蛛池模板: 日日碰狠狠躁久久躁综合网 | 久久一区二区三区超碰国产精品 | 欧美专区国产专区 | 中文字幕久久网 | 91成人在线视频 | 精品国内 | 日韩a级黄色片 | 探花系列在线 | 欧美日韩精品网站 | 精品一区二区电影 | 欧美一区二区在线刺激视频 | 国产精品 中文在线 | www.五月激情.com| 免费网站黄 | 久草青青在线观看 | 日本一区二区三区免费观看 | 激情五月开心 | 91高清不卡| 天天色草 | 激情综合五月天 | 欧美日韩精品免费观看视频 | 亚洲国产精品一区二区尤物区 | 999在线精品 | 99在线精品观看 | 97国产 | jizz18欧美18 | 91一区二区三区久久久久国产乱 | 最新日韩中文字幕 | 国产在线观看91 | 91精品久久久久久综合五月天 | 国产精品视频久久久 | 日韩在线一区二区免费 | 久久久久久免费网 | 久久五月精品 | 99久久精品免费看国产四区 | 国产精品99久久久久久武松影视 | 久久精品视频免费 | 日本精品视频免费观看 | 国产手机在线视频 | 久久久久久久久免费视频 | 婷婷精品在线视频 | 欧美一级片免费观看 | 成人黄色片在线播放 | 在线视频免费观看 | 欧美日韩激情视频8区 | 久久狠狠亚洲综合 | 久草视频免费看 | 欧洲色综合 | 久久午夜色播影院免费高清 | 波多野结衣在线视频免费观看 | 国产成人av免费在线观看 | 精品美女在线视频 | 操操操影院 | 国产亚洲免费的视频看 | 国产免费久久精品 | 91人人干 | 国产午夜剧场 | 免费观看成年人视频 | 免费av观看网站 | 欧美日韩国产精品久久 | 精品国产1区2区3区 国产欧美精品在线观看 | 久操操 | 国产精品嫩草55av | 免费看片亚洲 | 国产资源中文字幕 | 美女在线观看av | 天天操夜夜操国产精品 | 国产精品原创在线 | 伊人五月在线 | av片中文字幕 | 中文字幕二区三区 | 国产私拍在线 | 日韩二区在线观看 | 国产视频中文字幕 | 国产精选在线观看 | 精品国产乱码久久久久久三级人 | 1024手机在线看 | 97超碰免费在线观看 | 国产不卡一 | 又黄又爽又湿又无遮挡的在线视频 | 欧美精品视 | 午夜美女视频 | 久久人人爽人人片av | 精品国产一区在线观看 | 天天色欧美 | 国产精品ssss在线亚洲 | 成人影片在线免费观看 | 国产一区成人 | 中日韩男男gay无套 日韩精品一区二区三区高清免费 | 在线99视频 | 2019中文字幕网站 | 日韩精品在线播放 | 91精品国产九九九久久久亚洲 | 日日爽天天爽 | 在线观看黄色的网站 | 国产日韩中文字幕 | 成人四虎 | 超碰公开在线 | 中文在线a∨在线 |