深夜福利网址-深夜福利影院在线观看-深夜福利在线看-深夜精品视频-深夜日韩-深夜视频福利

Welcome to Dongguan Haochen Hot Runner Technology Co., Ltd!
中文    EN

Haochen 20 years of focus on multimode cavities and small spacing hot runner

Service /


Mobile: 13712972461
Tel: 0769-85478528
400-0988-117
Fax: 0769-85478508
Email: sales@hostar888.com
Website: www.beijingcp.com.cn
Address: No. 11 Zhenlang Road, Wusha Caiwu Industrial Second Road, Chang'an Town, Dongguan City
Company NewsYour location: Home > News > Company News

Discussion on Maintenance Details of Hot Runner Mold

Publisher: Administrator Date: 2023-11-02

Today we will talk about the maintenance of molds. Good molds require frequent maintenance, so today we will talk about the maintenance of convex and concave molds in hot runner molds; Maintenance of discharge plates; Inspection of guide parts; Pay attention to the maintenance details of adjusting the mold gap in these four aspects

1. Maintenance of convex and concave molds
When disassembling the convex and concave molds, attention should be paid to the original condition of the mold, so that it can be easily restored during subsequent mold installation. If there is any padding or displacement, the thickness of the padding should be engraved on the parts and recorded. When replacing the convex mold, it is necessary to try inserting and unloading blocks, check whether the concave mold is smooth, and whether the gap between the insertion and the concave mold is even, When replacing the concave mold, it is also necessary to test whether the gap between the insertion and the punch is even. In order to shorten the convex mold after grinding, it is necessary to add shims to reach the required length. The effective length of the convex mold should be checked to see if it is sufficient. When replacing a broken convex mold, the cause should be identified, and the corresponding concave mold should be checked to see if there are any broken edges and if grinding is necessary. When assembling the convex mold, it is necessary to check whether the gap between the convex mold and the fixed block or plate is sufficient, If there is a pressure block, check if there is any movement margin left. The assembly of the concave mold should be placed horizontally, and then a flat iron block should be placed on the concave mold surface. Use a copper rod to gently tap it in place, and do not force it diagonally. The bottom of the concave mold should be chamfered. After installation, check whether the concave mold surface is flush with the mold surface. After the assembly of the convex mold, the concave mold, and the mold core, necessary checks should be made on the care belt to ensure that all parts are installed incorrectly or reversed. Check whether the concave mold and the cushion blocks of the concave mold are installed backwards, and whether the feeding holes are blocked, Is it necessary to steal materials for the newly replaced parts, is there enough to steal materials, and whether the parts that need to be locked in the mold are locked tightly? Pay attention to confirming the locking of the stripper plate screws, and lock them from the inside out with balanced force and cross locking. Do not lock one screw first and then another screw to avoid causing the stripper plate to tilt, causing the punch to break or the mold accuracy to decrease
2. Maintenance of discharge plate
The disassembly of the discharge plate can first be balanced by prying it up with two elevators, and then using both hands to remove the force. When it is difficult to disassemble, the mold should be checked for cleanliness, all locking screws should be removed, and whether there should be any damage to the mold caused by material jamming. The cause should be identified and corresponding measures should be taken. Blindly handling is not allowed. When assembling the discharge plate, the convex mold and discharge plate should be cleaned first, and lubricating oil should be added to the guide pillar and the convex mold at the inlet, and it should be smoothly inserted. Then, both hands should be used to press it into place, And repeat several times. If it is too tight, the reason should be identified (whether the guide pillar and guide sleeve guide are normal, whether there are damages in each part, whether the new convex mold can smoothly pass through the discharge plate position is correct, etc.), and the reason should be identified before corresponding treatment. If there are pressure blocks on the fixed plate, check whether there is enough stealing on the discharge back plate. The material contact surface between the discharge plate and the concave mold should be checked, Long term stamping produces indentations (the material gap between the discharge plate and the concave mold is generally 0.03-0.05mm reduction in material thickness. When the indentations are severe, it can affect the pressing accuracy of the material, causing abnormal and unstable product dimensions. It is necessary to repair or regrind the discharge insert and discharge plate. The precision of the contour sleeve should be checked, as it will cause the discharge plate to tilt when it is not of the same height, and its precise guidance and stable spring pressing functions will be damaged, requiring maintenance
3. Inspection of guide parts
What is the clearance between the guide pillar and guide sleeve, whether there are burns or wear marks, and whether the oil supply status of the mold guide is normal? Inspection should be conducted. The wear and damage of the guide components can reduce the accuracy of the mold, and various parts of the mold may have problems. Therefore, appropriate maintenance and regular replacement must be carried out. Check the accuracy of the guide components. If the guide nails are worn, the expected accuracy and function of the material belt guide have been lost, It is necessary to replace the spring. Check the condition of the spring (discharge spring and top spring, etc.) to see if it is broken, or if it has been used for a long time but has not broken, but has lost its original strength due to fatigue. Regular maintenance and replacement must be carried out, otherwise it may cause damage to the mold or hinder production
4. Adjustment of mold clearance
The positioning hole of the mold core causes wear due to frequent and multiple combinations of the mold core, resulting in large gaps (resulting in looseness after assembly) or uneven gaps (resulting in positioning deviation) after assembly, which can cause the shape of the cross-section to deteriorate after punching, the convex mold is easy to break, and burrs are generated. By checking the condition of the cross-section after offset cutting, appropriate gap adjustments can be made. When the gap is small, the cross-section is small, and when the gap is large, the cross-section is large and the burrs are large. By shifting, a reasonable gap can be obtained, After adjustment, appropriate records should be made, and markings can also be made on the edge of the concave mold for subsequent maintenance operations. Daily production should pay attention to collecting and preserving the original material strips when the mold is in good condition. If the subsequent production is not smooth or the mold undergoes variation, it can be used as a reference for mold maintenance. In addition, auxiliary systems such as whether the top material pin is worn, whether it can top the material, whether the guide pins and bushings are worn, should be inspected and maintained



Dongguan Haochen Hot Runner Technology Co., Ltd
Contact Us:
Mobile: 13712972461
Tel: 0769 85478528/400 0988 117
Fax: 0769-85478508
Email: sales@hostar888.com
Website: www.beijingcp.com.cn
Address: No. 11 Zhenlang Road, Wusha Caiwu Industrial Second Road, Chang'an Town, Dongguan City

粵ICP備18086307號
CopyRight ? 2023 Dongguan Haochen Hot Runner Technology Co., Ltd. All Right Reserved.

Online
Service

ConsultationTime:9:00-18:00

Select customer service:

Hot
Line

400-0988-117
7*24H Service

Follow
Us

Website
TOP
主站蜘蛛池模板: 欧美日韩精品综合 | 日韩免费一级电影 | 69xx视频 | 欧美特一级片 | 九九免费在线观看视频 | 五月婷婷色丁香 | 中文在线a∨在线 | 久久桃花网 | 99热在线国产 | 日韩免费| 91视频高清免费 | 国产自产高清不卡 | 亚洲精品在 | 亚洲天天在线日亚洲洲精 | 青青河边草观看完整版高清 | 久久国产电影院 | 欧美精品免费在线 | 天天草天天爽 | 精品在线免费观看 | 91片在线观看 | 奇米影视777四色米奇影院 | 国产一区二区在线免费观看 | 日韩剧情 | 日韩电影黄色 | 国产一级一片免费播放放a 一区二区三区国产欧美 | 久久久久久激情 | 国产二区免费视频 | 精品福利网站 | 毛片一区二区 | 亚洲视频资源在线 | 精品嫩模福利一区二区蜜臀 | 国产精品一区二区在线 | 久久国产精品一区二区三区 | 最新av免费在线观看 | 国内99视频 | 国产精品高潮呻吟久久久久 | www.久久成人| 一本大道久久精品懂色aⅴ 五月婷社区 | 日日夜夜人人天天 | 狠狠色丁香久久婷婷综合丁香 | 中文字幕在线观看1 | 97超碰精品 | 精品久久久久久国产 | 日韩三级视频在线看 | 一区二区精品视频 | 婷婷激情影院 | 亚洲少妇xxxx | 久久亚洲私人国产精品va | 超碰在线免费97 | 在线观看的a站 | 玖玖玖国产精品 | 国产永久免费高清在线观看视频 | 日日操天天操夜夜操 | 激情www| 99久久精品免费看 | 在线视频18在线视频4k | 国产69精品久久久久9999apgf | 国产精品白虎 | 亚洲精品视频在线观看视频 | 一区二区不卡在线观看 | 久久麻豆精品 | 中文字幕在线视频免费播放 | 伊人影院得得 | 欧美日韩在线网站 | 久久久亚洲麻豆日韩精品一区三区 | 国产成人精品日本亚洲999 | 欧美一级高清片 | 97av视频| 久草电影网 | 超碰在线97国产 | 免费观看久久 | 亚洲国产中文字幕在线视频综合 | 五月婷网站 | 日本字幕网 | 欧美一区二区在线免费观看 | 国产精品理论在线观看 | 久久蜜桃av | 日韩网站视频 | 国产精品美女在线 | 免费视频久久 | 麻豆va一区二区三区久久浪 | 免费看一级特黄a大片 | 精品久久精品 | 伊人久久电影网 | 国产日本在线观看 | 2019中文在线观看 | 黄色电影在线免费观看 | 国产成人福利在线观看 | 亚洲精品女人久久久 | 中文字幕av最新更新 | 久草在在线视频 | 日韩免费在线观看视频 | 激情av网址 | 日韩69视频 | 一区二区精品视频 | 国产在线视频一区二区三区 | 久草视频中文在线 | 国产午夜影院 | 国产中文字幕91 |